Lovely to scroll through Facebook and find such positive feedback .
This is a small but complex build being built into the hill using our 8 inch core. This build would be a major risk during pour for most ICF systems as the small size means concrete is filled into the walls at a rapid rate, the larger core increasing the concrete pressure further. This build was poured in around an hour with no issues, a true testiment to the strength and robustness of the system
Adrian Prout and team have done a brilliant job with the R-Wall especially considering this has been their first build. Well done guys
Comments